What we do
Bathroom installation can be disruptive. My prime objective is to ensure that the whole process is as seamless and trouble free as possible.
All bathroom fixtures and fittings will be delivered to your property during the week prior to fitting.
Generally, the installation will involve the following elements (as discussed and agreed):
Waste removal - hire of skip (if practicable)
All carpets and floors in the vicinity of the bathroom will be covered with protective material
Removal of all current bathroom fittings, tiles and flooring
Ceiling (and if necessary exposed walls) to be re-skimmed by professional plasterer.
All electrics to be fitted by a certified electrician who will issue a safety certificate on completion
Ceiling to be painted in bathroom grade emulsion by professional decorator
and for peace of mind…..
All waste pipework (sink, bath, shower) to be replaced with solvent weld to as far back to the stack as possible
Hot and cold water pipework to be replaced where necessary and channelled into walls
Radiator pipes to be re-positioned, and channelled into walls
Waterproof board and tanking in all wet areas
Depending on specific customer requirements, all walls to be tiled floor to ceiling. Grouted in colour of your choice to be confirmed
Floor to be overboarded with suitable waterproof board
Bath, vanity unit, toilet, shower, shower screen, vanity mirrors all fitted
Clean, seal and demonstrate new equipment during handover