What we do

Bathroom installation can be disruptive. My prime objective is to ensure that the whole process is as seamless and trouble free as possible.  

  • All bathroom fixtures and fittings will be delivered to your property during the week prior to fitting.

  • Generally, the installation will involve the following elements (as discussed and agreed):

  • Waste removal - hire of skip (if practicable)

  • All carpets and floors in the vicinity of the bathroom will be covered with protective material

  • Removal of all current bathroom fittings, tiles and flooring

  • Ceiling (and if necessary exposed walls) to be re-skimmed by professional plasterer.

  • All electrics to be fitted by a certified electrician who will issue a safety certificate on completion

  • Ceiling to be painted in bathroom grade emulsion by professional decorator

    and for peace of mind…..

  • All waste pipework (sink, bath, shower) to be replaced with solvent weld to as far back to the stack as possible

  • Hot and cold water pipework to be replaced where necessary and channelled into walls

  • Radiator pipes to be re-positioned, and channelled into walls

  • Waterproof board and tanking in all wet areas 

  • Depending on specific customer requirements, all walls to be tiled floor to ceiling. Grouted in colour of your choice to be confirmed

  • Floor to be overboarded with suitable waterproof board

  • Bath, vanity unit, toilet, shower, shower screen, vanity mirrors all fitted

  • Clean, seal and demonstrate new equipment during handover